BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//The Waterland Blog - ECPv6.17.5//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:The Waterland Blog
X-ORIGINAL-URL:https://waterlandblog.com
X-WR-CALDESC:Events for The Waterland Blog
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/Los_Angeles
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20200308T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20201101T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20210314T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20211107T090000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0800
TZOFFSETTO:-0700
TZNAME:PDT
DTSTART:20220313T100000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0700
TZOFFSETTO:-0800
TZNAME:PST
DTSTART:20221106T090000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/Los_Angeles:20211215T180000
DTEND;TZID=America/Los_Angeles:20211215T190000
DTSTAMP:20211207T003645Z
CREATED:20211207T003645Z
LAST-MODIFIED:20211207T003645Z
UID:140174-1639591200-1639594800@waterlandblog.com
SUMMARY:24th Ave South Improvement Project Open House will be Wed.\, Dec. 15
DESCRIPTION:An online/virtual Open House will be held for the 24th Ave South Improvement Project on Wednesday\, Dec. 15\, 2021\, from 6 – 7 p.m. \nCity staff will discuss the project and answer questions from the public. \nThe virtual meeting can be accessed at the project’s website below: \nhttps://www.desmoineswa.gov/departments/public_works/transportation_engineering/current_projects \n \nPROJECT DESCRIPTION & NEED\nIn November 2011\, the City produced the City of Des Moines Safe Routes to School Project Report. This report provided a summary of priority Safe Routes to School projects for the five public elementary schools in the City. The report was developed with help from the Des Moines Police Department and Highline Schoold District. Projects were selected in order to enhance safety for students and families walking to school. The report found that pedestrian improvements on 24th Ave ranked as the top priority for Midway Elementary School and had the highest ranking of all projects Citywide. \nRoadway widening and improvement of 24th Ave S\, Kent-Des Moines Rd (SR516) to S 223rd St is an element of the adopted City of Des Moines Comprehensive Transportation Plan (CTP)\, Transportation Improvement Plan (TIP)\, and Capital Improvement Plan (CIP). This project is Segment 2 of the 24th Ave S Corridor Improvements\, with future Segment 1 improvements designated between S 223rd St and S 216th St. \nThe 24th Ave S Improvements Project (Segment 2) will construct improvements on 24th Ave S\, between Kent-Des Moines Road and S 223rd Street. These improvements include: sidewalks\, bike lanes\, reduced travel lane widths\, a two-way left turn lane\, storm drainage\, and decorative street lighting. \nIn 2019\, the City of Des Moines was selected for a grant from the Washington State Transportation Improvement Board (hereinafter TIB) for project funding on the 24th Avenue South Improvements Project. This partnership with TIB allowed the City to fully fund the project and advance into preliminary design\, right-of-way acquisition\, and ultimately construction. \nFOR MORE INFORMATION\nContact Tommy Owen at towen@desmoineswa.gov or 206-870-6870. \nHOW MIGHT THIS PROJECT AFFECT ME?\nIn January 2022\, the project will move into the right-of-way acquisition phase in order to construct the necessary improvements within City right-of-way. It is anticipated that some private property will be needed along select parcels within the 24th Ave project corridor. City staff and the City’s right-of-way consultant may be in contact with you regarding these right-of-way acquisitions. The City hopes to have design work and right-of-way acquisitions completed by early 2022 in order to start construction of the project during the summer of 2022. \nANTICIPATED PROJECT SCHEDULE: \n\n\n\nPreliminary Engineering Design — Complete\nFinal Engineering Design — December 2021\nRight-of-Way Acquisitions — January 2022 to June 2022\nProject Construction — Summer 2022
URL:https://waterlandblog.com/event/24th-ave-south-improvement-project-open-house-will-be-wed-dec-15/
LOCATION:Online\, Des Moines\, WA\, 98198\, United States
END:VEVENT
END:VCALENDAR