Tag: city of Des Moines wa

$4.7 million, re-built Redondo Boardwalk scheduled to open this Summer

A public update meeting was held on Friday, Jan. 8 at the MaST Center, and City of Des Moines Transportation Engineer Andrew Merges said that the renovation of the Redondo Boardwalk is targeted for a Summer 2016 opening, with construction set to being in March. Project funding – for just over $4.7 million – has been secured, […]

Read More
Loading

SUPPORT OUR SPONSORS

SUPPORT LOCAL JOURNALISM

Weather

Des Moines
55°
Rain
7:04am6:54pm PDT
Feels like: 54°F
Wind: 8mph SSW
Humidity: 83%
Pressure: 29.78"Hg
UV index: 0
21h22h23h
54°F
54°F
54°F
TueWedThu
59/50°F
57/54°F
61/50°F